This is the year when we start building the last and final stage of housing here, Buildings H & I. We have pre-sold enough to start the building contract and we are all very excited to see this last and final stage underway.
We are still busy selling the last homes in Earthsong and have only 4 left now. Very interesting watching this last block being built as it contains some different buildings. It comprises of two terrace houses (as before), but then 4 single units and the last bit being two bedroom apartments that vary slightly to the other design. Interestingly enough we could have sold more single units as they have proved to be very popular.
We have modified the design on H & I block giving them “hats” all around the top of the lower stories as protection, and have also decided to put colour steel on the roofs. Both of these will cost a bit extra but are well worth it.
Apart from the building side of life we are really settling down into enjoying our Common House. We are starting to have celebration and parties notably Kaaren’s birthday party and the Pyjama party complete with coin trail and sleepover. Check out the photos in the gallery section to see us enjoying this new extension of our homes.
We also have now completed our Compost Toilet, a Clivus Multrum and have enjoyed a really fun evening with its grand opening.